top of page
Minimalistic%252520Photography%252520of%

NEW HOME ALL STAGE INSPECTION SERVICES

Quality & Care

It is important to note that the Victoria government’s mandatory inspections only include pre-slab, steel, frame and final stage.

The all stage inspections conducted by L2L HOMES are significantly more thorough and independent than those conducted by surveying firms who are often nominated by builders.

New Home All Stage Inspection Services: Services
Wave
L2L HOMES BASE STAGE INSPECTION
BASE STAGE

Once concrete has been poured, it is very hard to know what issues exist in the structure. We pick up lots defects present in this stage which building surveyor often neglects to either detect or report on these issues.​​

Construction Engineer
FRAME STAGE

What we inspect at frame stage are according to the Australian Standards (AS 1684 Residential timber-framed construction, AS 1860-2006 Installation of particleboard flooring), the Building Code of Australia (BCA), VBA guide to standards and tolerances 2015 and the relevant engineer’s drawings and specifications.

微信图片_20200301123052.jpg
LOCK UP STAGE

What we inspect at lock up stage are according to the Australian Standards ( AS 3700-2001 Masonry structures,AS2050-2002 Installation of roof tiles), the Building Code of Australia (BCA), VBA guide to standards and tolerances 2015 and the relevant engineer’s drawings and specifications.

微信图片_20200301123048.jpg
FIXING STAGE

What we inspect at fixing stage are according to the AS 3740-2004 Waterproofing of wet areas within residential buildings,AS/NZS 2589-2017 Gypsum linings - Application and finishing, the Building Code of Australia (BCA), VBA guide to standards and tolerances 2015 and the relevant engineer’s drawings and specifications.

微信图片_20200301122949.jpg
PCI STAGE

Practical Completion Inspection (PCI) is a very important inspection for new homeowners to identify any defects and get them fixed before handover. A lot of people think that inspections of new houses are not required because they are carried out by the building surveyor. The fact is, the building surveyor ensures the building is technically habitable while our pre-handover inspection by contrast is focused on the completeness and quality of the workmanship, and is concerned with the delivery of exactly what is been agreed upon in your contract. What we inspect at practical completion inspection stage are according to the Australian Standards, the Building Code of Australia (BCA), the relevant engineer’s drawings and specifications, VBA guidelines to standards and tolerances 2015.

New Home All Stage Inspection Services: Get a Quote

GET A QUOTE

Select Stage

Thanks for submitting!

Space Planning

0404 504366

Monday to Friday  9:00-17:00

L2L HOMES

560 Lonsdale Street, Melbourne, Australia 

WeChat-ID: AdminL2LHOMES   

Wechat%20Barcode-%20Admin%20L2LHOMES_edi
  • Facebook

Subscribe Form

©2019 by L2L Homes. All Rights Reserved

bottom of page